Luling Business Park - Phase 1 2030 Rue Sucre, Suite 100 40,000 - 125,000 SF of 4-Star Industrial Space Available in Luling, LA 70070

Virtual Tour

HIGHLIGHTS

  • Luling Business Park Phase I, 2030 Rue Sucre, is a New Construction 125,000-square-foot warehouse building available immediately.
  • Outdoor storage opportunity with excess land for a laydown yard or trailer storage.
  • Additional acreage available for build-to-suit opportunities up to 1.2 million square feet.
  • Fully equipped commercial warehouse facility with 14 dock positions, two drive-in doors, heavy power, and an ESFR sprinkler system.
  • Immediate Interstate-310 access places tenants 13 minutes from New Orleans International Airport and 26 minutes from the Port of New Orleans.

FEATURES

Clear Height
26’
Column Spacing
30’ x 62’
Warehouse Floor
10”
Drive In Bays
2
Exterior Dock Doors
16

ALL AVAILABLE SPACE(1)

Display Rental Rate as

  • SPACE
  • SIZE
  • TERM
  • RENTAL RATE
  • SPACE USE
  • CONDITION
  • AVAILABLE
  • 1st Floor
  • 40,000-125,000 SF
  • Negotiable
  • Upon Request
  • Industrial
  • -
  • Now
  • Lease rate does not include utilities, property expenses or building services
  • 2 Drive Ins
  • 16 Loading Docks
  • Includes 2,500 SF of dedicated office space
  • Space is in Excellent Condition
  • Yard
Space Size Term Rental Rate Space Use Condition Available
1st Floor 40,000-125,000 SF Negotiable Upon Request Industrial - Now

1st Floor

Size
40,000-125,000 SF
Term
Negotiable
Rental Rate
Upon Request
Space Use
Industrial
Condition
-
Available
Now

PROPERTY OVERVIEW

The Luling Business Park is a 750,000 SF Class A Distribution, Assembly, and Light Manufacturing Complex just off Interstate 310 in Luling, LA. Phase 1 is 125,000 SF and can be demised to 40,000+ SF user spaces. Additional land is available to construct a facility of any size. The building features excess land for outdoor storage and/or trailer storage, ESFR Sprinklers, a minimum 26-ft eave height (with 30ft eave at first column), an oversized truck turning area, a full dock package, and drive-in overhead doors. Construction completed March 2025, and is ready for immediate occupancy. Luling is ideally situated to service the greater New Orleans market, as it is 24 miles from downtown and 11 miles from New Orleans International Airport (MSY). Esperanza Business Park is a Certified Site by Louisiana Economic Development, meaning it has been examined by 3rd party engineers and deemed ready for development. The project website, including weekly construction update photos, can be found at www.LulingBusinessPark.com

DISTRIBUTION FACILITY FACTS

Building Size
125,000 SF
Lot Size
53.00 AC
Year Built
2025
Construction
Metal
Sprinkler System
ESFR
Power Supply
Amps: 2,500 Volts: 480 Phase: 3 Wire: 3
Zoning
M1/M2 Industrial - M1/M2 Heavy Industrial

MARKETING BROCHURE

MORE ATTACHMENTS

Rue Sucre Brochure

DEMOGRAPHICS

REGIONAL ACCESSIBILITY

50 Miles 50 Mi. 100 Miles 100 Mi. 500 Miles 500 Mi.
CITY
POPULATION
MILES
DRIVE TIME
Houston
2,325,502
337
6 h 28 m
Dallas
1,345,047
494
8 h 54 m
Austin
964,254
497
9 h 23 m
Fort Worth
895,008
533
9 h 43 m
San Antonio
1,532,233
542
9 h 57 m
Nashville
669,053
553
10 h 5 m
ACCESS AND LABOR FORCE
10 MILES
Total Population
100,988
Total Labor Force
50,470
Unemployment Rate
3.83%
Median Household Income
$59,291
Warehouse Employees
8,920
High School Education Or Higher
86.60%

LEASING AGENT

LEASING AGENT

(504) 586-2007
Contact
Andrew Marcus, Leasing Associate
(504) 586-2007
Contact
Andrew joined PMG Leasing in May, 2019 as a licensed real estate agent. He holds a B.S. in Economics and Urban Studies from the College of Charleston and a Masters of Sustainable Real Estate Development from Tulane University.
  • Listing ID: 33353032

  • Date on Market: 9/30/2024

  • Last Updated:

  • Address: 2030 Rue Sucre, Suite 100, Luling, LA 70070