This feature is unavailable at the moment.

We apologize, but the feature you are trying to access is currently unavailable. We are aware of this issue and our team is working hard to resolve the matter.

Please check back in a few minutes. We apologize for the inconvenience.

- LoopNet Team

You must register your contact information to view secure information on this listing.
You must register your contact information to view secure information on this listing.

Share This Listing

Please enter a valid email address.

Note: To send this property to multiple individuals, insert a semi-colon between each recipient's email address.

LoopNet has taken a strong stance against the practice of sending unsolicited commercial emails, also known as "spam." Please send these emails only to people you know who would be interested in this property. If someone asks you not to send these emails to them, please comply.

thank you

Your email has been sent!

Build to Suit Mining or Tier 3 Data Center 500 N 4th St

200,000 SF of 4-Star Flex Space Available in Coshocton, OH 43812

Highlights

  • Environmentally Sustainable Design for High Performance Compute
  • Mining, Data Center and High Performance Compute – all available on site.

Features

Drive In Bays
1
Interior Dock Doors
1
Exterior Dock Doors
1

all available space(1)

Display Rental Rate as

  • Space
  • Size
  • Term
  • Rental Rate
  • Space Use
  • Condition
  • Available
  • 1st Floor - 1000
  • 200,000 SF
  • 10 Years
  • Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request
  • Flex
  • Full Build-Out
  • 120 Days

125 Acres- 200 MW of Capacity - Established Bitcoin Operations with industry leaders – 5 MW in production - 20 MW Tier III Data Center Approved Support Facilities: - Mining- 1MW Containers - Data Center – 200,000 SF Utility Power Capacity : - 50 MW Capacity avalable in 2020 - 90 MW Capacity avalable in 2021 - 200 MW Capacity available 2020 Utility Power Design: - 69 kV - 13.8 kV - 415 V - 3 Substations with Onsite Substation Site Benefits: - Existing Water Rights for Liquid Cooling 12,000,000 gallons of water per day - Supports High Performance Compute - Can support 125/kW density Electricity Power Rates: - Sub .03 kWH (AEP-Ohio) Flood Zone: - Outside 500-year flood plain Seismic: - Outside earthquake fault zone - Seismically isolated facility Remote Hands: - 1-hour response time in business hours - 4-hour response time after hours Security: - 24 x 7 x 365 - Biometric / card access - CCTV / motion sensors Fiber Providers: - AT&T, Crown Castle and Centurylink Build to Suit Design: - UPS, N+2, parallel redundant - PDU, 2N - Cooling System, 2N - Generators, N+1 - Outside 500-year flood plain Compliance: - SSAE 16 Type 2 SOC 1

  • Includes 1 SF of dedicated office space
  • 1 Drive Bay
  • Plug & Play
  • Fully Built-Out as Specialty Space
  • High End Trophy Space
  • 2 Loading Docks
  • Mostly Open Floor Plan Layout
Space Size Term Rental Rate Space Use Condition Available
1st Floor - 1000 200,000 SF 10 Years Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request Flex Full Build-Out 120 Days

1st Floor - 1000

Size
200,000 SF
Term
10 Years
Rental Rate
Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request
Space Use
Flex
Condition
Full Build-Out
Available
120 Days

1st Floor - 1000

Size 200,000 SF
Term 10 Years
Rental Rate Upon Request
Space Use Flex
Condition Full Build-Out
Available 120 Days

125 Acres- 200 MW of Capacity - Established Bitcoin Operations with industry leaders – 5 MW in production - 20 MW Tier III Data Center Approved Support Facilities: - Mining- 1MW Containers - Data Center – 200,000 SF Utility Power Capacity : - 50 MW Capacity avalable in 2020 - 90 MW Capacity avalable in 2021 - 200 MW Capacity available 2020 Utility Power Design: - 69 kV - 13.8 kV - 415 V - 3 Substations with Onsite Substation Site Benefits: - Existing Water Rights for Liquid Cooling 12,000,000 gallons of water per day - Supports High Performance Compute - Can support 125/kW density Electricity Power Rates: - Sub .03 kWH (AEP-Ohio) Flood Zone: - Outside 500-year flood plain Seismic: - Outside earthquake fault zone - Seismically isolated facility Remote Hands: - 1-hour response time in business hours - 4-hour response time after hours Security: - 24 x 7 x 365 - Biometric / card access - CCTV / motion sensors Fiber Providers: - AT&T, Crown Castle and Centurylink Build to Suit Design: - UPS, N+2, parallel redundant - PDU, 2N - Cooling System, 2N - Generators, N+1 - Outside 500-year flood plain Compliance: - SSAE 16 Type 2 SOC 1

  • Includes 1 SF of dedicated office space
  • High End Trophy Space
  • 1 Drive Bay
  • 2 Loading Docks
  • Plug & Play
  • Mostly Open Floor Plan Layout
  • Fully Built-Out as Specialty Space

Property Overview

Economic Incentives Mining Incentives - Member of Ohio Manufacturer’s Association - Taxes able to be paid in bitcoin - Recognized as the most friendly mining state - Low Cost of Ownership - Full Turnkey solution and Operations on site Data Center Incentives - Tax Abatement on Hardware Purchases - Low Latency Fiber Routes to Columbus Carrier Hotels - Low Latency Fiber Route to AWS Node in Columbus - AWS Direct Connect Options Available - Proximity to leading Cloud Provider Access Points

PROPERTY FACTS

Building Size
200,000 SF
Lot Size
25.00 AC
Year Built
2026
Construction
Steel

Attachments

Brochure
  • Listing ID: 18262474

  • Date on Market: 1/22/2020

  • Last Updated:

  • Address: 500 N 4th St, Coshocton, OH 43812

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, 'rating') }}
255 character limit ({{ remainingChars() }} characters remainingover)
{{ getErrorText(feedbackForm.msg, 'rating') }}
{{ getErrorText(feedbackForm.fname, 'first name') }}
{{ getErrorText(feedbackForm.lname, 'last name') }}
{{ getErrorText(feedbackForm.phone, 'phone number') }}
{{ getErrorText(feedbackForm.phonex, 'phone extension') }}
{{ getErrorText(feedbackForm.email, 'email address') }}