Your email has been sent.
Corner Of Highways 151 & 13
Marion, IA 52302
Marion Enterprise Center - Fiber Incentive · Land For Sale
·
61.18 AC


INVESTMENT HIGHLIGHTS
- Certified Site
- Unique Technology Incentives
- Land Incentive Program
- All Utilities Installed
- Adjacent to General Aviation Airport
- Four Lane Highway
EXECUTIVE SUMMARY
Existing tenants include ElPlast America, Legacy Manufacturing, SpeeDee Delivery Service, Electric Specialty Manufacturing, Twenty40 Building Concepts, Fosters Kraus Plumbing, Heating and Air, OTC Industrial Technologies, Cameron Ashley Building Products and Rapids Wholesale.
PROPERTY FACTS
| Sale Type | Investment or Owner User | Proposed Use | |
| No. Lots | 9 | Total Lot Size | 61.18 AC |
| Property Type | Land | Cross Streets | Highway 13 |
| Property Subtype | Industrial | ||
| Zoning | Planned Development | ||
| Sale Type | Investment or Owner User |
| No. Lots | 9 |
| Property Type | Land |
| Property Subtype | Industrial |
| Proposed Use | |
| Total Lot Size | 61.18 AC |
| Cross Streets | Highway 13 |
| Zoning | Planned Development |
9 LOTS AVAILABLE
Lot 3
| Price | $822,000 | Lot Size | 13.70 AC |
| Price Per AC | $60,000.00 |
| Price | $822,000 |
| Price Per AC | $60,000.00 |
| Lot Size | 13.70 AC |
Certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres. Are you a company needing redundant fiber access? Contact us to learn more about our innovative fiber access incentive.
Lot 4
| Price | $474,000 | Lot Size | 7.90 AC |
| Price Per AC | $60,000.00 |
| Price | $474,000 |
| Price Per AC | $60,000.00 |
| Lot Size | 7.90 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 5
| Price | $399,000 | Lot Size | 5.70 AC |
| Price Per AC | $70,000.00 |
| Price | $399,000 |
| Price Per AC | $70,000.00 |
| Lot Size | 5.70 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 9
| Price | $923,000 | Lot Size | 7.10 AC |
| Price Per AC | $130,000.00 |
| Price | $923,000 |
| Price Per AC | $130,000.00 |
| Lot Size | 7.10 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 10
| Price | $552,000 | Lot Size | 6.90 AC |
| Price Per AC | $80,000.00 |
| Price | $552,000 |
| Price Per AC | $80,000.00 |
| Lot Size | 6.90 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 11
| Price | $328,000 | Lot Size | 4.10 AC |
| Price Per AC | $80,000.00 |
| Price | $328,000 |
| Price Per AC | $80,000.00 |
| Lot Size | 4.10 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 12
| Price | $216,000 | Lot Size | 2.70 AC |
| Price Per AC | $80,000.00 |
| Price | $216,000 |
| Price Per AC | $80,000.00 |
| Lot Size | 2.70 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 13
| Price | $294,400 | Lot Size | 3.68 AC |
| Price Per AC | $80,000.00 |
| Price | $294,400 |
| Price Per AC | $80,000.00 |
| Lot Size | 3.68 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
Lot 17
| Price | $564,000 | Lot Size | 9.40 AC |
| Price Per AC | $60,000.00 |
| Price | $564,000 |
| Price Per AC | $60,000.00 |
| Lot Size | 9.40 AC |
Iowa's most active certified site. Preliminary Platted lots range in size from 3.6 to 13.7 acres. Largest combined lot size of 38 acres.
DESCRIPTION
The Marion Enterprise Center is the premier general industrial park in the Cedar Rapids metro. Our certified park features preliminary platted lots, allowing companies to easily select and configure lot size and location due to the fact that the park is not final platted. All infrastructure including electric, water, storm water, fiber, and natural gas are available and installed to sites. Due diligence requirements and studies including environmental, geo-tech boring, wetland, and archaeological reports have been completed and are available upon request. The park is bordered by an adjacent business park, two four-lane highways, and the Marion Municipal Airport. Existing tenants include Legacy Manufacturing, Elplast America, Spee-Dee Delivery Services, Electric Specialty Manufacturing, Rapids Wholesale, Hupp Electric Motors, Guardian Building Products, and Consumers Supply.
